Up Timberframe-House-on-the-Lake Prev Next Slideshow

 At first page  Next image  Index page
 
 
 
 
 
  August-2008.jpg - An erector set on a serious level!  All the pieces are milled at the factory and delivered to the site after the plans have been drawn and carefully scrutinized.  The builder on this job has had a lot of experience in building timberframe houses.  
August-2008-1
August-2008-2
August-2008-3
June 2009-1
June 2009-2

August-2008 | An erector set on a serious level! All the pieces are milled at the factory and delivered to the site after the plans have been drawn and carefully scrutinized. The builder on this job has had a lot of experience in building timberframe houses.
Total images: 12 | Last update: 6/3/09 1:36 PM | Help